WaveMaster(TM) Acoustic Cleaning

 

Always on, low intensity cleaning with the sootblowers in a remedial role.

  • Sound waves work on the flue gas not on tubes/elements

  • Prevents accumulation of fireside deposits

  • Removes existing deposits

  • Uniform effect throughout several tube banks or the entire air preheater rotor

  • Non directional so Acoustic Cleaners can be installed in a convenient place

  • Prevents accumulation of ABS deposits

 

Benefits

 

  • Improves thermal efficiency

  • Reduces differential pressures and saves fans HP

  • Reduces need for sootblowing

  • No need for off-line cleaning

  • No opacity excursions

 

Even works in traditionally difficult applications

 

  • Staggered tube banks

  • Extended surface tube banks

  • PBS type deposit

 

Download brochure here or visit manufacturer website.

 

 

 

Acoustic Cleaning (not horns)

33.5 VIT with PRB ash BEFORE

33.5 VIT with PRB ash BEFORE

This picture was taken during the outage (no cleaning was done)

33.5 VIT with PRB

33.5 VIT with PRB

All the lose material is gone. It is clean 24/7, resulting in lower pressure drop, longer element life, and higher availability.

CO-boiler with Catalyst Fines

CO-boiler with Catalyst Fines

Years of plugging removed.

CO-boiler with Catalyst Fines

CO-boiler with Catalyst Fines

Same boiler, looking at the Superheater bank. This boiler operates for years on end, without sootblowers, in an always clean condition.

33.5 VIT with PRB AFTER

33.5 VIT with PRB AFTER

After 6 months of operation this picture was taken. Note how all the lose ash is gone. As you see the elements here, this is how clean it stays during operation. Always on.

31.5 VIT with PRB type ash

31.5 VIT with PRB type ash

Intermediate layer fouling all resolved. Ask about the technical paper.

1300 MW backpass with Eastern Coal

1300 MW backpass with Eastern Coal

Significant ash accumulation on the economizer front wall. Ash pile was 15' tall and 110' long

1300 MW backpass with Eastern Coal

1300 MW backpass with Eastern Coal

What was left of the ash pile after 6 months.

Office